H71.67.1E
Harrison St., 1st to 6th, July 10, 1925
10-Jul-25
3.5 in HIGH x 5.75 in WIDE
(8.89 cm HIGH x 14.60 cm WIDE)
(8.89 cm HIGH x 14.60 cm WIDE)
Museum Purchase
H71.67.1E
Construction of the Posey Tube
Construction scene. View of road cut. Construction workers. Saroni.
© 2024 Oakland Museum of California
RIGHTS AND REPRODUCTION