construction

c. 1939

Construction of the Alameda County Courthouse

Betsy Willcuts, Feb. 2002

Bibliography: THE HEART OF OAKLAND, A Walking Guide to Lake Merritt by Leslie Flint, Sponsored by the Camron-...

Shredded Wheat Plant under construction, corner of 12th and Poplar Streets, West Oakland.

1915

Oakland Auditorium exterior, under construction 1915. Standard Oil Auditorium

ca. 1925

Construction of city hall

c.1919

Oakland Auditorium, Front Exterior View from 12th Street.

1914

(Aerial view of shipyard showing smoke from a fire) Actually picture is of a shipyard, showing lumber and pipe supplies in yard; steam-not smoke- is coming from the three cranes in the yard (...

Lakeview School, exterior, Grand Avenue at MacArthur Blvd..

Oakland Auditorium under construction, interior

5/9/16

Construction of Shredded Wheat Factory, looking east from Poplar St., This factory is now called "Nabisco" and still remains, occuping the block bound by 12th St., Poplar St., 14th St., and Union...

16-Dec-35

This black and white glossy photograph, backed in linen, with a margin on the proper right, puched with three holes, shows the Alameda County Court House under construction, from the west side of...

7-Dec-35

Black and white glossy photograph of the new Alameda County Courthouse under construction; backed with linen, with a three hole punched margin at the proper right side. The bottom section of ther...

12-Oct-35

Black and white glossy photograph, backed in linen, with a margin punch with three holes down the proper right side. The image shows the participants and viwers at the Cornerstone Laying...

9/3/26

No. 107. Camera, 4x5"; Lens, 7-1/8"; Scene, Tube #? passing thru Webster St. Bridge, just entering from the west; Location of Camera, on Standard Oil Co. dock, northern side of Estuary and west...

9/3/26

No. 107. Camera, 4x5"; Lens, 7-1/8"; Scene, Tube #? passing thru Webster St. Bridge, just entering from the west; Location of Camera, on Standard Oil Co. dock, northern side of Estuary and west...

3/4/26

77 - Looking down Harrison Street from Third to Second, showing method of timbering used in transmission section.

10/9/26

No. 127. Camera, 8x10"; Lens, 8"; Scene, Alameda Portal Bldg., and scene south thereof, showing Webster St., Alameda, in the distance, Alameda Portal Bldg., and first section of tube submerged in...

1/8/26

Wrecking of the old Webster Street Bridge to make way for the construction of the new Oakland Alameda Tube. Looking North Toward the foor side of Webster Street on the Oakland Side. Jan 8, 1926...

1/8/26

(On front of photo) Suction Dredge excavating Southward on the Alameda Side along the line of Webster street after the removal of the pavement and top surface by steam shovel and clamsnell.

9/22/26

No. 122. Camera, 8x10"; Lens, 12"; Scene, section No. "L" of the Estuary Tube in the Tube cut which is between Alameda Portal Building and esturay, Camera pointed a little east of north, the ;clam...

1/8/26

Suction dredge Excavating Southward on the Alameda Side of the Estuary Along the line of Webster Street after removal of the pavement on Webster St. Alameda. Jan 8, 1926.

1/8/26

No. 68 Camera 8x10. Lens, 24". Scene, south end of Webster St., detour bridge and general activities of steam shovel in background, etc., this being an exact duplication of No. ET43, which was...

1/8/26

Demolishing the Webster Street Bridge to Make Way For the Construction of the new Oakland-Alameda Posey Tube. Looking Toward the Oakland Side of the Estuary. Jan. 8, 1926

1/8/26

Demolishing the old Webster Street Bridge to Make Way for the Construction of the new Oakland-Alameda Tube. Jan. 8, 1926.

1/8/26

Early Construction Scene Looking Toward the Alameda Side of the Estuary Showing Dredger At work. Jan. 8, 1926.

© 2019 Oakland Museum of California